
The Anji Chamber of Commerce Building is led by the United Front Work Department of the County Party Committee and the County Federation of Industry and Commerce. After multiple rounds of communication and coordination, and with the attention and support of the leaders of the County Party Committee, County Government, and relevant departments, the project's land acquisition, demolition, environmental assessment, construction project approval, and other work were resolved and approved one by one after two years. And strictly set admission conditions, mobilize and organize member enterprises and under construction enterprises in the county to purchase office buildings within the prescribed time, enjoy government preferential policies, and fully implement the occupancy of 73 enterprises.
The Anji Chamber of Commerce Building is currently the first Chamber of Commerce building under construction in our city. The building is a comprehensive commercial office complex that integrates private enterprise headquarters, technology research and development, product display, conference, exhibition, business and trade, administrative service center, and urban and rural planning exhibition. After completion, it will become one of the business centers and landmark buildings in our county, serving as a window to showcase the image and products of non-public enterprises and a base for activities and exchanges among non-public entrepreneurs. The project covers an area of 54 acres with a total investment of 1.1 billion yuan. The building consists of three main buildings, with a designed height of 99 meters and a total construction area of 180000 square meters. The implementation of the Chamber of Commerce Building project plays a very important role in the development of headquarters economy and building economy in our county, accelerating the transformation and upgrading of non-public enterprises, improving the level of modern service industry and urban quality.
Quotation for Electric Opening Configuration Scheme for Anji Chamber of Commerce Building Project
According to the drawings and other information provided by the customer, the Anji Chamber of Commerce Building project has a total of 186 electrically operated windows, each equipped with one set of single chain window openers, requiring a total of 188 sets. The detailed configuration is as follows:
D3-D6 facade and D6-D3 facade: There are 2 floors with electric opening windows, of which 2F has a total of 40 windows, equipped with 40 single chain window openers, 1 60A control box, and 1 manual switch; 3F has a total of 24 windows, equipped with 24 single chain window openers, 1 30A control box, and 1 manual switch.
D-C-D-L Facade: 4F has 14 electrically operated windows, equipped with a total of 14 single chain window openers, 2 15A control boxes, and 2 manual switches.
A-E~A-A Facade: There are 4 floors with electric opening windows, and 2F has 8 windows in total. It is equipped with 8 single chain window openers, 2 5A control boxes, and 2 manual switches; There are a total of 16 windows in 20F, 24F, and 26F, each equipped with 16 single chain window openers, 2 15A control boxes, and 2 manual switches.
D-M-D-A facade: 4F has 52 electrically operated windows, equipped with a total of 52 single chain window openers, 2 30A control boxes, and 2 manual switches.
Total: 186 single chain window openers, 1 60A control box, 3 30A fire control boxes, 8 15A control boxes, 2 5A control boxes, and 14 manual switches.